Compare Quotes
  • All Services
  • Find Pros
  • QuoteCheck
  • Get Free Quotes
Cost Guides
  • All Cost Guides
  • Home Maintenance
  • Cleaning & Pest
  • AC, Pool & Water
  • Renovation & Interiors
  • Moving & Packing
  • Lessons & Tutoring
  • More Home Services
Free Calculators
  • All Calculators
  • Moving Cost
  • Renovation Cost
  • AC Service Cost
Neighbors
  • Home Ideas & Stories
  • Join Your Community

© 2026 Bestimate Solutions L.L.C-FZ · Dubai, UAE

TermsPrivacyEditorial Standards

Compare your two written quotes

Enter actual AED prices. No suggested market rate or automatic complexity multiplier.

1–100 whole items; the same quantity applies to both quotes.

Count complete blind units, not windows, individual slats, cords or chains. One window may have several blinds. Use per-item rates only for the same diagnosed repair on matching units; ask providers to extend other units or use whole-job totals for mixed mechanisms. Motorised repair does not imply a complete replacement motor. A replacement quote may be recorded separately, but do not confirm matching scope between repair and replacement. Enter all provider amounts on the same confirmed VAT basis. Customer purchases use the final whole-job receipt total including retail VAT, never a per-item amount. If you buy the main product, put separately billed provider components in the relevant extra, without duplicating them. Required unpriced costs stay unknown, not free. Enter full project costs, not a balance after a deposit; booking payments and refundable security deposits are recorded separately, not added as extras or deducted as visit credits.

Amounts: AED 0–1,000,000 without commas, up to two decimals. Blank remains unknown. These input limits catch mistakes; they are not market ranges.

Quote A

Enter the written price. Any included parts or extras must be marked included below, not added again.

Visit, credits and job extras

Confirm every line. Unknown is not included or free. All amounts here are once per job, not per item.

Your separate parts purchases use their final retail total. For mixed VAT terms within a provider quote, ask for amounts on one consistent basis first.

Quote B

Enter the written price. Any included parts or extras must be marked included below, not added again.

Visit, credits and job extras

Confirm every line. Unknown is not included or free. All amounts here are once per job, not per item.

Your separate parts purchases use their final retail total. For mixed VAT terms within a provider quote, ask for amounts on one consistent basis first.

Quote A

Incomplete — known provider amounts only

Not calculated

9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.

Cost breakdown and unresolved terms
Labour / package
Unknown
Provider-supplied parts
Unknown
Visit / diagnosis
Unknown
Electrical diagnosis, controls and commissioning extras
Unknown
Bracket, substrate and compatible cord-safety work
Unknown
Removal, workshop collection and reinstallation
Unknown
Access equipment, parking and return visits
Unknown
Visit credit against approved work
Unknown
Provider total with confirmed VAT treatment
Incomplete
Separate customer parts, final retail total
Unknown

A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.

  • Confirm: Valid labour / package amount and pricing unit
  • Confirm: Parts supply terms and amount
  • Confirm: Visit / diagnosis charge
  • Confirm: Electrical diagnosis, controls and commissioning extras
  • Confirm: Bracket, substrate and compatible cord-safety work
  • Confirm: Removal, workshop collection and reinstallation
  • Confirm: Access equipment, parking and return visits
  • Confirm: Visit credit: confirm none or an amount no higher than the visit fee and eligible provider work
  • Confirm: VAT treatment of provider amounts

Quote B

Incomplete — known provider amounts only

Not calculated

9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.

Cost breakdown and unresolved terms
Labour / package
Unknown
Provider-supplied parts
Unknown
Visit / diagnosis
Unknown
Electrical diagnosis, controls and commissioning extras
Unknown
Bracket, substrate and compatible cord-safety work
Unknown
Removal, workshop collection and reinstallation
Unknown
Access equipment, parking and return visits
Unknown
Visit credit against approved work
Unknown
Provider total with confirmed VAT treatment
Incomplete
Separate customer parts, final retail total
Unknown

A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.

  • Confirm: Valid labour / package amount and pricing unit
  • Confirm: Parts supply terms and amount
  • Confirm: Visit / diagnosis charge
  • Confirm: Electrical diagnosis, controls and commissioning extras
  • Confirm: Bracket, substrate and compatible cord-safety work
  • Confirm: Removal, workshop collection and reinstallation
  • Confirm: Access equipment, parking and return visits
  • Confirm: Visit credit: confirm none or an amount no higher than the visit fee and eligible provider work
  • Confirm: VAT treatment of provider amounts
Confirm comparable scope

Check only what both providers have confirmed. These are quote checks, not a technical approval by this calculator.

Comparison pending. Complete both totals and all scope confirmations. An unconfirmed part, compatibility check or extra is not zero.

Keep children away from accessible cords and loops. Do not knot cords, bypass safety devices, dismantle springs or open mains-powered mechanisms. Stop use for unstable mounting, damaged wiring or overheating; the lower price is not proof of child safety or electrical suitability.

Request curtains and blinds enquiries quotes

Curtains and blinds enquiries · Open full calculator