Compare your two written quotes
Enter actual AED prices. No suggested market rate or automatic complexity multiplier.
One complete agreed project per quote. Quantities and unit rates must already be extended in the written amount.
Keep quantity 1 with provider-extended whole-job totals. Do not enter linear metres, doors, drawers or bays as interchangeable item counts. Fix the height, depth, internal layout, finish and supplied hardware before comparing. A per-linear-metre advertisement is not an installed total for a different layout. Use full-project amounts, not balances after deposits. All provider lines must use one confirmed VAT basis; a package already containing materials must not have them added again. Unknown required charges remain unresolved. Customer purchases are final whole-job receipt totals including retail VAT. Booking payments and refundable deposits are outside this comparison, not visit credits.
Amounts: AED 0–1,000,000 without commas, up to two decimals. Blank remains unknown. These input limits catch mistakes; they are not market ranges.
Quote A
Incomplete — known provider amounts only
Not calculated
9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.
Cost breakdown and unresolved terms
- Labour / package
- Unknown
- Provider-supplied parts
- Unknown
- Visit / diagnosis
- Unknown
- Removal, substrate assessment and preparation
- Unknown
- Drawers, doors, accessories or finish upgrades outside package
- Unknown
- Separately assessed lighting and electrical work
- Unknown
- Delivery, lifting, access, fitting and making good extras
- Unknown
- Visit credit against approved work
- Unknown
- Provider total with confirmed VAT treatment
- Incomplete
- Separate customer parts, final retail total
- Unknown
A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.
- Confirm: Valid labour / package amount and pricing unit
- Confirm: Parts supply terms and amount
- Confirm: Visit / diagnosis charge
- Confirm: Removal, substrate assessment and preparation
- Confirm: Drawers, doors, accessories or finish upgrades outside package
- Confirm: Separately assessed lighting and electrical work
- Confirm: Delivery, lifting, access, fitting and making good extras
- Confirm: Visit credit: confirm none or an amount no higher than the visit fee and eligible provider work
- Confirm: VAT treatment of provider amounts
Quote B
Incomplete — known provider amounts only
Not calculated
9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.
Cost breakdown and unresolved terms
- Labour / package
- Unknown
- Provider-supplied parts
- Unknown
- Visit / diagnosis
- Unknown
- Removal, substrate assessment and preparation
- Unknown
- Drawers, doors, accessories or finish upgrades outside package
- Unknown
- Separately assessed lighting and electrical work
- Unknown
- Delivery, lifting, access, fitting and making good extras
- Unknown
- Visit credit against approved work
- Unknown
- Provider total with confirmed VAT treatment
- Incomplete
- Separate customer parts, final retail total
- Unknown
A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.
- Confirm: Valid labour / package amount and pricing unit
- Confirm: Parts supply terms and amount
- Confirm: Visit / diagnosis charge
- Confirm: Removal, substrate assessment and preparation
- Confirm: Drawers, doors, accessories or finish upgrades outside package
- Confirm: Separately assessed lighting and electrical work
- Confirm: Delivery, lifting, access, fitting and making good extras
- Confirm: Visit credit: confirm none or an amount no higher than the visit fee and eligible provider work
- Confirm: VAT treatment of provider amounts
Comparison pending. Complete both totals and all scope confirmations. An unconfirmed part, compatibility check or extra is not zero.
No load capacity, anchorage or structural approval is calculated. Do not drill or remove tall units to take measurements. The installer must assess fixing, stability and concealed services; a lower price does not establish equivalent quality.