Compare your two written quotes
Enter actual AED prices. No suggested market rate or automatic complexity multiplier.
One complete agreed project per quote. Quantities and unit rates must already be extended in the written amount.
Agree dimensions, material grade and thickness, fabrication details, finish, exposure and site fixing responsibilities. Decorative screens, furniture frames, wall panels and planters need their own drawings. Do not treat a per-kilogram metal price as the fabricated and installed item cost. Use whole-project amounts, never unextended per-door, per-seat, per-kWp, per-square-metre or per-kilogram rates. Ask each provider to extend measured quantities, minimum charges and allowances into written totals first. Keep quantity 1. All provider amounts must share one confirmed VAT basis; normalize mixed tax bases before entry. Customer purchases use final receipt amounts. Deposits are not discounts or visit credits; refundable deposits and fees paid directly to an authority remain outside this result. Add only extras excluded from the main package.
Amounts: AED 0–1,000,000 without commas, up to two decimals. Blank remains unknown. These input limits catch mistakes; they are not market ranges.
Quote A
Incomplete — known provider amounts only
Not calculated
9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.
Cost breakdown and unresolved terms
- Labour / package
- Unknown
- Provider-supplied parts
- Unknown
- Visit / diagnosis
- Unknown
- Survey, shop drawings, samples and permission coordination
- Unknown
- Specified finishing and corrosion-protection extras
- Unknown
- Delivery, lifting, site access and disposal extras
- Unknown
- Assessed fixing, making good, inspection and handover
- Unknown
- Visit credit against approved work
- Unknown
- Provider total with confirmed VAT treatment
- Incomplete
- Separate customer parts, final retail total
- Unknown
A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.
- Confirm: Valid labour / package amount and pricing unit
- Confirm: Parts supply terms and amount
- Confirm: Visit / diagnosis charge
- Confirm: Survey, shop drawings, samples and permission coordination
- Confirm: Specified finishing and corrosion-protection extras
- Confirm: Delivery, lifting, site access and disposal extras
- Confirm: Assessed fixing, making good, inspection and handover
- Confirm: Visit credit: confirm none or an amount no higher than the visit fee and eligible provider work
- Confirm: VAT treatment of provider amounts
Quote B
Incomplete — known provider amounts only
Not calculated
9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.
Cost breakdown and unresolved terms
- Labour / package
- Unknown
- Provider-supplied parts
- Unknown
- Visit / diagnosis
- Unknown
- Survey, shop drawings, samples and permission coordination
- Unknown
- Specified finishing and corrosion-protection extras
- Unknown
- Delivery, lifting, site access and disposal extras
- Unknown
- Assessed fixing, making good, inspection and handover
- Unknown
- Visit credit against approved work
- Unknown
- Provider total with confirmed VAT treatment
- Incomplete
- Separate customer parts, final retail total
- Unknown
A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.
- Confirm: Valid labour / package amount and pricing unit
- Confirm: Parts supply terms and amount
- Confirm: Visit / diagnosis charge
- Confirm: Survey, shop drawings, samples and permission coordination
- Confirm: Specified finishing and corrosion-protection extras
- Confirm: Delivery, lifting, site access and disposal extras
- Confirm: Assessed fixing, making good, inspection and handover
- Confirm: Visit credit: confirm none or an amount no higher than the visit fee and eligible provider work
- Confirm: VAT treatment of provider amounts
Comparison pending. Complete both totals and all scope confirmations. An unconfirmed part, compatibility check or extra is not zero.
This tool cannot approve structural steel, balustrades, fire-rated assemblies, suspended items or any load-bearing or fall-protection system. These are outside this decorative-item comparison and need qualified design and assessment. A material name alone does not establish corrosion resistance or safe fixing.