Enter actual AED prices. No suggested market rate or automatic complexity multiplier.
1–100 whole items; the same quantity applies to both quotes.
Match the measured area, material, condition, jointing, stain-treatment limits and runoff plan. Paving, timber, coated surfaces and elevated facades are not interchangeable scopes. Normally use quantity 1 and enter the confirmed whole-job / whole-period package in the labour field. Do not put square metres, hours or visits in the item count. Have the provider extend those rates to your actual agreed scope first. Mark packaged supplies and equipment included; add only separately charged lines.
Amounts: AED 0–1,000,000 without commas, up to two decimals. Blank remains unknown. These input limits catch mistakes; they are not market ranges.
Incomplete — known provider amounts only
Not calculated
9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.
A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.
Incomplete — known provider amounts only
Not calculated
9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.
A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.
Comparison pending. Complete both totals and all scope confirmations. An unconfirmed part, compatibility check or extra is not zero.
Pressure jets can cause serious injury and damage surfaces. Keep people and pets away. Do not use a ladder with a washer, wash live electrics, or allow uncontrolled contaminated runoff. This tool does not prescribe a pressure setting or authorise work.