Compare your two written quotes
Enter actual AED prices. No suggested market rate or automatic complexity multiplier.
One complete agreed project per quote. Quantities and unit rates must already be extended in the written amount.
Agree the stone type, finish, thickness, approved sample, wall dimensions, openings, returns and billed waste. Keep preparation and fixing responsibilities explicit. Natural stone, engineered products and stone-look PVC or MDF panels are not interchangeable specifications. Use whole-project amounts, never unextended per-door, per-seat, per-kWp, per-square-metre or per-kilogram rates. Ask each provider to extend measured quantities, minimum charges and allowances into written totals first. Keep quantity 1. All provider amounts must share one confirmed VAT basis; normalize mixed tax bases before entry. Customer purchases use final receipt amounts. Deposits are not discounts or visit credits; refundable deposits and fees paid directly to an authority remain outside this result. Add only extras excluded from the main package.
Amounts: AED 0–1,000,000 without commas, up to two decimals. Blank remains unknown. These input limits catch mistakes; they are not market ranges.
Quote A
Incomplete — known provider amounts only
Not calculated
9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.
Cost breakdown and unresolved terms
- Labour / package
- Unknown
- Provider-supplied parts
- Unknown
- Visit / diagnosis
- Unknown
- Removal, substrate preparation and assessed fixing work
- Unknown
- Returns, corners, cut-outs, trims and finishing extras
- Unknown
- Delivery, lifting, access equipment and disposal extras
- Unknown
- Survey, drawings, permission coordination and handover
- Unknown
- Visit credit against approved work
- Unknown
- Provider total with confirmed VAT treatment
- Incomplete
- Separate customer parts, final retail total
- Unknown
A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.
- Confirm: Valid labour / package amount and pricing unit
- Confirm: Parts supply terms and amount
- Confirm: Visit / diagnosis charge
- Confirm: Removal, substrate preparation and assessed fixing work
- Confirm: Returns, corners, cut-outs, trims and finishing extras
- Confirm: Delivery, lifting, access equipment and disposal extras
- Confirm: Survey, drawings, permission coordination and handover
- Confirm: Visit credit: confirm none or an amount no higher than the visit fee and eligible provider work
- Confirm: VAT treatment of provider amounts
Quote B
Incomplete — known provider amounts only
Not calculated
9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.
Cost breakdown and unresolved terms
- Labour / package
- Unknown
- Provider-supplied parts
- Unknown
- Visit / diagnosis
- Unknown
- Removal, substrate preparation and assessed fixing work
- Unknown
- Returns, corners, cut-outs, trims and finishing extras
- Unknown
- Delivery, lifting, access equipment and disposal extras
- Unknown
- Survey, drawings, permission coordination and handover
- Unknown
- Visit credit against approved work
- Unknown
- Provider total with confirmed VAT treatment
- Incomplete
- Separate customer parts, final retail total
- Unknown
A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.
- Confirm: Valid labour / package amount and pricing unit
- Confirm: Parts supply terms and amount
- Confirm: Visit / diagnosis charge
- Confirm: Removal, substrate preparation and assessed fixing work
- Confirm: Returns, corners, cut-outs, trims and finishing extras
- Confirm: Delivery, lifting, access equipment and disposal extras
- Confirm: Survey, drawings, permission coordination and handover
- Confirm: Visit credit: confirm none or an amount no higher than the visit fee and eligible provider work
- Confirm: VAT treatment of provider amounts
Comparison pending. Complete both totals and all scope confirmations. An unconfirmed part, compatibility check or extra is not zero.
This tool cannot verify stone weight, substrate capacity, adhesive compatibility, mechanical fixings or facade safety. Heavy, exterior, elevated or wet-area installations need appropriate professional assessment and a specified system; a lower total does not approve the installation.