Compare Quotes
  • All Services
  • Find Pros
  • QuoteCheck
  • Get Free Quotes
Cost Guides
  • All Cost Guides
  • Home Maintenance
  • Cleaning & Pest
  • AC, Pool & Water
  • Renovation & Interiors
  • Moving & Packing
  • Lessons & Tutoring
  • More Home Services
Free Calculators
  • All Calculators
  • Moving Cost
  • Renovation Cost
  • AC Service Cost
Neighbors
  • Home Ideas & Stories
  • Join Your Community

© 2026 Bestimate Solutions L.L.C-FZ · Dubai, UAE

TermsPrivacyEditorial Standards

Compare your two written quotes

Enter actual AED prices. No suggested market rate or automatic complexity multiplier.

1–100 whole items; the same quantity applies to both quotes.

Match the named roof outlets, strainers, gutters where fitted, downstream pipe extent, debris removal and controlled flow-check limits. Membrane repair, concealed-pipe investigation and drainage alterations are separate agreed scopes. A small flow check is not a storm-capacity or waterproofing certificate. Keep quantity 1 and select whole-job for labour/package and any separately charged provider materials. Ask the provider to extend all per-item, linear-metre, hourly or capacity-based offers into a written total for the agreed job first; those units are not the item count here. Mark charges already inside the package included and enter only separately charged lines. Customer-bought materials use the final receipt total including any retail VAT; do not tax them again.

Amounts: AED 0–1,000,000 without commas, up to two decimals. Blank remains unknown. These input limits catch mistakes; they are not market ranges.

Quote A

Enter the written price. Any included parts or extras must be marked included below, not added again.

Visit, credits and job extras

Confirm every line. Unknown is not included or free. All amounts here are once per job, not per item.

Your separate parts purchases use their final retail total. For mixed VAT terms within a provider quote, ask for amounts on one consistent basis first.

Quote B

Enter the written price. Any included parts or extras must be marked included below, not added again.

Visit, credits and job extras

Confirm every line. Unknown is not included or free. All amounts here are once per job, not per item.

Your separate parts purchases use their final retail total. For mixed VAT terms within a provider quote, ask for amounts on one consistent basis first.

Quote A

Incomplete — known provider amounts only

Not calculated

9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.

Cost breakdown and unresolved terms
Labour / package
Unknown
Provider-supplied parts
Unknown
Visit / diagnosis
Unknown
Roof-access equipment separately charged beyond package
Unknown
Additional agreed downpipe diagnosis or clearing
Unknown
Replacement guards / fittings outside package or materials
Unknown
Separately charged debris collection and waste removal
Unknown
Visit credit against approved work
Unknown
Provider total with confirmed VAT treatment
Incomplete
Separate customer parts, final retail total
Unknown

A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.

  • Confirm: Valid labour / package amount and pricing unit
  • Confirm: Parts supply terms and amount
  • Confirm: Visit / diagnosis charge
  • Confirm: Roof-access equipment separately charged beyond package
  • Confirm: Additional agreed downpipe diagnosis or clearing
  • Confirm: Replacement guards / fittings outside package or materials
  • Confirm: Separately charged debris collection and waste removal
  • Confirm: Visit credit: confirm none or an amount no higher than the visit fee and eligible provider work
  • Confirm: VAT treatment of provider amounts

Quote B

Incomplete — known provider amounts only

Not calculated

9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.

Cost breakdown and unresolved terms
Labour / package
Unknown
Provider-supplied parts
Unknown
Visit / diagnosis
Unknown
Roof-access equipment separately charged beyond package
Unknown
Additional agreed downpipe diagnosis or clearing
Unknown
Replacement guards / fittings outside package or materials
Unknown
Separately charged debris collection and waste removal
Unknown
Visit credit against approved work
Unknown
Provider total with confirmed VAT treatment
Incomplete
Separate customer parts, final retail total
Unknown

A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.

  • Confirm: Valid labour / package amount and pricing unit
  • Confirm: Parts supply terms and amount
  • Confirm: Visit / diagnosis charge
  • Confirm: Roof-access equipment separately charged beyond package
  • Confirm: Additional agreed downpipe diagnosis or clearing
  • Confirm: Replacement guards / fittings outside package or materials
  • Confirm: Separately charged debris collection and waste removal
  • Confirm: Visit credit: confirm none or an amount no higher than the visit fee and eligible provider work
  • Confirm: VAT treatment of provider amounts
Confirm comparable scope

Check only what both providers have confirmed. These are quote checks, not a technical approval by this calculator.

Comparison pending. Complete both totals and all scope confirmations. An unconfirmed part, compatibility check or extra is not zero.

Do not climb for photos, work on a wet roof, block outlets to flood a roof or approve an uncontrolled hose or chemical test. Keep clear of water near electrics or a bulging ceiling and use the appropriate emergency/property-management route. This tool cannot assess safe access, roof integrity or approval requirements.

Request drain cleaning quotes

Drain cleaning · Open full calculator