What this calculator compares
List each tree, species if known, location, condition and agreed pruning objective. Ask the provider to price the actual tree schedule and access plan, then enter its combined job total. Pruning, palm care, complete removal and stump removal are different scopes. Keep quantity 1 and select whole-job for labour/package and any separately charged provider materials. Ask each supplier to extend its per-square-metre, linear-metre, panel, cushion, tree or hourly rates into a written total for the exact agreed job first; those units are not the item count here. Mark anything already inside a package included, and enter only separately charged lines. Customer-bought materials use the final receipt total including any retail VAT; do not tax them again.
This tool calculates from your entered quotations; it does not estimate a market tariff or verify a provider. Blank prices, unknown tax terms and unresolved extras keep the result incomplete. You must confirm the topic-specific scope checks before a cost difference appears.
How the arithmetic works
Labour is either the entered whole-job total or a per-item amount multiplied by the shared item quantity. Separate provider parts use the same unit choice. Each visit and extra charge is a whole-job amount added once. Use agreed whole-job totals for mixed models, repair units or prices.
Provider amount = labour/package + separately charged provider parts + visit + extras − eligible visit credit. A credit cannot exceed either the charged visit fee or the entered provider work excluding that visit. It cannot offset customer-bought parts. An included or no-charge visit is not deducted again. This model does not handle a separate cash refund arrangement.
The standard UAE VAT rate is 5%. VAT is added once to VAT-exclusive provider amounts, and not added to amounts already including VAT or confirmed not charged. Enter all of one provider’s amounts on the same VAT basis.
Project cost = provider total after its VAT treatment + your separately purchased parts at their final retail total, including any retail VAT and delivery. This keeps customer-supplied parts visible without taxing them twice. Already-owned parts count at the value you explicitly enter; entering zero deliberately excludes their historic purchase cost. No deposit or prior payment is deducted, so the result is not a remaining balance.
A worked example
Illustrative arithmetic only, not a market rate: AED 500 for the agreed whole job, AED 200 of separately charged provider materials and AED 100 of confirmed extras total AED 800 before tax, or AED 840 if all provider charges exclude 5% VAT. The visit and every other required line are confirmed included or not needed. Do not add an included material or extra twice.
Assumptions and limits
Money is entered in AED with up to two decimal places. Each monetary field is limited to AED 1,000,000; item counts to 100; handyman lists to 12 rows; hours to 100; and technicians to 20. These are input-error safeguards, not market, capacity or safety limits. Invalid values are not silently rounded into valid inputs. Calculated monetary lines, VAT and totals are rounded to two decimal places.
Unentered damage, scope changes and future work are excluded. The known-provider subtotal uses the amounts as entered, without adding unconfirmed VAT or customer purchases; it is not an all-in quote. Even a complete cost comparison does not certify suitability, workmanship, insurance or approval.
Do not climb, operate cutting tools at height or attempt work near power lines. Keep people clear of the work zone and use a competent tree-care professional. This tool does not diagnose tree stability, approve topping or establish permission to prune public or protected trees.