Compare room-echo treatment proposals using the same panel specification, mounting build-up and agreed room objective.
Compare complete treatment for the same home room. Product-only square metres, installed panels and a whole-room design are different purchases. NRC or an absorption class does not calculate room coverage or neighbour-noise reduction.
Your quotes only, not market estimates. AED amounts: 0–1,000,000; quantities: above 0 to 10,000, up to two decimals. No commas or negative discounts. These are input limits, not service-price guidance. Blank is unknown, not zero.
Quote A — enter / reviewQuote B — enter / review
Quote A
AED 0.00
Confirmed charges only — incomplete, not an all-in total
8 unresolved checks
Room assessment and acoustic design: price or inclusion is not confirmed.
Specified panels or complete supply package: price or inclusion is not confirmed.
Backing, battens and mounting system: price or inclusion is not confirmed.
Installation, cutting and edge finishing: price or inclusion is not confirmed.
Protection, making good and access extras: price or inclusion is not confirmed.
Agreed post-installation review or measurement: price or inclusion is not confirmed.
Enter at least one actual quoted price (including an explicitly confirmed zero).
Confirm minimum charges, exclusions, discounts and booking terms for this quote.
Quote B
AED 0.00
Confirmed charges only — incomplete, not an all-in total
8 unresolved checks
Room assessment and acoustic design: price or inclusion is not confirmed.
Specified panels or complete supply package: price or inclusion is not confirmed.
Backing, battens and mounting system: price or inclusion is not confirmed.
Installation, cutting and edge finishing: price or inclusion is not confirmed.
Protection, making good and access extras: price or inclusion is not confirmed.
Agreed post-installation review or measurement: price or inclusion is not confirmed.
Enter at least one actual quoted price (including an explicitly confirmed zero).
Confirm minimum charges, exclusions, discounts and booking terms for this quote.
Comparison pending: complete both quotes and confirm the same scope. Missing fees and unknown tax do not count as zero.
Prepayments are not discounts: this is total cost, not the remaining balance. Refundable deposits are excluded. A required unquoted charge keeps the comparison incomplete. No acoustic performance, structural fixing or fire-suitability approval is made. Noise transmission, ceiling loads and regulated building changes require a separate competent assessment.