Compare complete installations for the same opening, including the work hidden behind a pocket-door finish. Enter your written quotations; no market rates are assumed.
One agreed interior doorway project. A pocket conversion and a surface-mounted slider are alternatives, not like-for-like specifications; compare matching systems or treat totals as different options. Whole-job amounts are entered once.
Your quotes only, not market estimates. AED amounts: 0–1,000,000; quantities: above 0 to 10,000, up to two decimals. No commas or negative discounts. These are input limits, not service-price guidance. Blank is unknown, not zero.
Quote A — enter / reviewQuote B — enter / review
Quote A
AED 0.00
Confirmed charges only — incomplete, not an all-in total
8 unresolved checks
Survey, design and agreed approval coordination: price or inclusion is not confirmed.
Door leaf, specified frame or track and hardware: price or inclusion is not confirmed.
Opening, pocket construction and support work: price or inclusion is not confirmed.
Confirmed electrical or other service relocation: price or inclusion is not confirmed.
Door fitting, adjustment and handover: price or inclusion is not confirmed.
Plaster, paint, trims, protection and disposal: price or inclusion is not confirmed.
Enter at least one actual quoted price (including an explicitly confirmed zero).
Confirm minimum charges, exclusions, discounts and booking terms for this quote.
Quote B
AED 0.00
Confirmed charges only — incomplete, not an all-in total
8 unresolved checks
Survey, design and agreed approval coordination: price or inclusion is not confirmed.
Door leaf, specified frame or track and hardware: price or inclusion is not confirmed.
Opening, pocket construction and support work: price or inclusion is not confirmed.
Confirmed electrical or other service relocation: price or inclusion is not confirmed.
Door fitting, adjustment and handover: price or inclusion is not confirmed.
Plaster, paint, trims, protection and disposal: price or inclusion is not confirmed.
Enter at least one actual quoted price (including an explicitly confirmed zero).
Confirm minimum charges, exclusions, discounts and booking terms for this quote.
Comparison pending: complete both quotes and confirm the same scope. Missing fees and unknown tax do not count as zero.
Prepayments are not discounts: this is total cost, not the remaining balance. Refundable deposits are excluded. A required unquoted charge keeps the comparison incomplete. This tool cannot approve structural work, fire-door changes, accessibility, acoustic performance or concealed-service clearance. Do not cut a wall or alter a protected entrance on the strength of a price comparison.