Wood Floor Restoration Quote Comparison
Source and scope review dates are provided in each linked article. Use written provider prices, not guessed market averages. Compare the same completed booking or programme; the tool does not verify a provider.
Wood Floor Restoration Quote Comparison
Compare assessed restoration of the same existing timber floor, with repairs, coating and room handover included explicitly.
Existing solid or suitable engineered timber only, assessed by a flooring professional. Compare one complete restoration job; square metres of new floor supply are not equivalent. Leave unpriced necessary repairs unresolved.
Your quotes only, not market estimates. AED amounts: 0–1,000,000; quantities: above 0 to 10,000, up to two decimals. No commas or negative discounts. These are input limits, not service-price guidance. Blank is unknown, not zero.
Quote A — enter / review
Quote B — enter / review
Quote A
AED 0.00
Confirmed charges only — incomplete, not an all-in total
8 unresolved checks
- Assessment and agreed restoration package: price or inclusion is not confirmed.
- Board repairs and matching timber: price or inclusion is not confirmed.
- Stain, sample approval and finish extras: price or inclusion is not confirmed.
- Furniture movement and protection: price or inclusion is not confirmed.
- Skirting, thresholds and making good: price or inclusion is not confirmed.
- Access, cleanup and minimum-charge top-up: price or inclusion is not confirmed.
- Enter at least one actual quoted price (including an explicitly confirmed zero).
- Confirm minimum charges, exclusions, discounts and booking terms for this quote.
Quote B
AED 0.00
Confirmed charges only — incomplete, not an all-in total
8 unresolved checks
- Assessment and agreed restoration package: price or inclusion is not confirmed.
- Board repairs and matching timber: price or inclusion is not confirmed.
- Stain, sample approval and finish extras: price or inclusion is not confirmed.
- Furniture movement and protection: price or inclusion is not confirmed.
- Skirting, thresholds and making good: price or inclusion is not confirmed.
- Access, cleanup and minimum-charge top-up: price or inclusion is not confirmed.
- Enter at least one actual quoted price (including an explicitly confirmed zero).
- Confirm minimum charges, exclusions, discounts and booking terms for this quote.
Prepayments are not discounts: this is total cost, not the remaining balance. Refundable deposits are excluded. A required unquoted charge keeps the comparison incomplete. This tool cannot determine remaining wear-layer thickness, coating compatibility, moisture condition or whether sanding is safe. It does not prescribe a sanding process or guarantee colour matching.
Request quotes for this serviceTransparent arithmetic, not an automatic quote
A complete line total is added once. A unit rate is multiplied by the provider-confirmed billable quantity. Each extended line is rounded to two decimals; 5% is added only when you explicitly confirm that treatment for that line. Final tax-inclusive amounts and confirmed no-VAT lines are not taxed again. The total adds rounded line amounts.
Amounts already included in an entered package are not added twice. Minimum charges, discounts and credits must be resolved in the written amounts before entry. Never subtract a booking payment as a discount. Refundable deposits remain outside total service cost.
For different currencies or tax treatments, get confirmed AED-equivalent final amounts first. The tool does not determine tax liability, currency rates, international duties or refund eligibility. Unknown required charges prevent a complete comparison.
The scope checks are your confirmations, not a technical assessment. A cheaper entered total does not establish quality, safety or completion. No account, saved quote or external submission is created by this calculator.