Apartment renovation in Dubai is priced by scope, not by square footage alone — the same 2-bedroom unit can be a paint-and-floor refresh or a full strip-out with new bathrooms, kitchen, ceilings and MEP. This page gives you honest 2026 planning ranges from Bestimate's published cost guides, explains the building NOC steps that apply to almost every Dubai apartment, and shows how to request and compare itemised quotes from renovation contractors with one request.
2026 benchmark
AED 25,000-600,000+ per apartment
As of June 2026, that is the realistic span from a light studio refresh to a luxury or penthouse-style scope. Most owners plan far inside it: light refreshes commonly start around AED 25,000-60,000 and full mid-range 2-3 bedroom renovations around AED 120,000-320,000. Full breakdowns are in the Apartment Renovation Dubai Cost Guide.
Apartment renovation cost in Dubai by scope
Treat these as planning bands, not quotes. A responsible contractor still needs apartment size, current condition, building rules, material selections and an exact scope before pricing.
| Scope | 2026 planning range | What it usually covers |
|---|---|---|
| Light studio / 1BR refresh | AED 25,000-60,000 | Painting, minor ceiling repairs, basic lighting, small fixture replacement |
| Targeted 1-2BR upgrade | AED 60,000-180,000 | One bathroom, kitchen refresh, flooring, lighting, wardrobes, paint and selected MEP fixes |
| Full mid-range 2-3BR renovation | AED 120,000-320,000 | Bathrooms, kitchen, full flooring, ceiling and lighting, MEP coordination, painting |
| Premium full renovation | AED 250,000-400,000+ | Premium materials, custom joinery, stone or quartz, upgraded bathrooms, AC coordination, stricter project management |
| Luxury / penthouse-style scope | AED 350,000-600,000+ | Bespoke joinery, imported stone, smart home, major MEP coordination, designer finishes, longer approvals |
Source: Apartment Renovation Dubai Cost Guide, checked June 2026. VAT, authority fees, building deposits, appliances, furniture and temporary accommodation may be separate.
Room-by-room budget lines
Pricing each budget line separately is the fastest way to see why two lump-sum quotes differ.
| Budget line | 2026 planning range |
|---|---|
| Bathroom — light refresh | AED 8,000-18,000 |
| Bathroom — standard apartment scope | AED 30,000-55,000 |
| Bathroom — premium or layout change | AED 55,000-80,000+ |
| Kitchen — basic refresh | AED 8,000-25,000 |
| Kitchen — typical full renovation | AED 30,000-120,000 |
| Kitchen — premium remodel | can exceed AED 260,000 |
| Approvals — NOC, drawings and permit (layout-change scope) | AED 4,000-20,000 |
Sources: bathroom cost guide and kitchen cost guide (June 2026), permits and NOC guide (August 2026). Once demolition or waterproofing is involved, a bathroom moves into the full-renovation tiers even if the headline number looks lower.
What basic, standard and premium tiers include
Ask every contractor to state which tier their price actually delivers. Two quotes far apart on price are often describing different tiers, not different margins.
| Item | Basic | Standard | Premium |
|---|---|---|---|
| Flooring | Repairs or overlay in worn areas | Full replacement in living areas with levelling and underlay | Large-format tile, engineered timber or stone throughout |
| Bathrooms | Fixture and silicone refresh, no tiling | One or two full renovations with new waterproofing and testing | All bathrooms with concealed cisterns, niches, custom vanities and glass |
| Kitchen | Repaint or reface, same layout | New cabinetry and countertop, appliances by allowance | Custom joinery, stone or quartz, appliance and services relocation |
| MEP (electrical, plumbing, AC) | Like-for-like fixes only | Selected new points, coordination priced as measured scope | Rewiring or re-piping where needed, load and duct changes with approvals |
Process and typical timeline
- Fix the scope in writing. Room list, photos, floor plan if available, finish level, and whether any plumbing, electrical or AC points move.
- Collect itemised quotes against that same scope. Comparing three or more room-by-room quotes exposes allowances and exclusions before you commit.
- Secure the building NOC and any authority permit. Building or community NOCs run from same-day to about two weeks; a standard layout-change scope takes roughly 3-5 weeks end to end across NOC, drawings and permit.
- Site setup and protection. Lift booking, corridor and lobby protection, gate passes and neighbour notice per building rules.
- Demolition and MEP first fix. Hidden plumbing, drainage or electrical findings surface here — this is what the 10-20% contingency is for.
- Wet areas and waterproofing. Membrane, corners, drain detail and a water test before any tiling, with photos before surfaces close.
- Finishes and installation. Flooring, ceilings, joinery, kitchen, painting and final MEP fit-off.
- Snagging, cleaning and deposit release. Close snag items and clear debris — the building's deposit refund inspection depends on it.
| Project type | Typical duration |
|---|---|
| Cosmetic refresh | 1-3 weeks after access approval |
| Kitchen or bathroom renovation | 3-8 weeks |
| Full 1-2BR apartment | 6-12 weeks |
| Premium 3BR / penthouse | 12-24+ weeks |
Durations from the apartment cost guide (June 2026) and the permits and NOC guide (August 2026).
Building NOC and approvals: what applies to apartments
Apartments differ from villas in one important way: the building comes first. Before any authority is involved, the owners association, developer or facility management will normally require an NOC covering contractor documents, insurance, work hours, lift protection, deposit and neighbour notice — for most scopes, including some cosmetic ones. Only after that does the government layer apply, and which authority depends on the zone: Dubai Municipality for most mainland buildings, Trakhees for PCFC-regulated areas such as Palm Jumeirah, and the DDA for its free-zone developments.
- Building or community NOC fees: commonly AED 0-5,000, with minor-works NOCs often AED 0-1,500
- Refundable security deposit: AED 2,000-20,000, returned after the final inspection
- Drawings, engineering and submissions: AED 2,500-15,000 for scopes that need them
- Authority permit fees: roughly AED 200-10,000 depending on zone and floor area
Cosmetic repainting and like-for-like flooring overlays usually need no authority permit, though the building may still want a light NOC. Removing partition walls, relocating plumbing or electrical points, remodelling wet areas or altering a false ceiling near fire or MEP systems commonly needs both layers. Skipping approvals is a false economy — Dubai's construction works law provides for fines of up to AED 50,000 plus stop-work instructions, and unapproved work resurfaces at deposit release or resale. The full breakdown by developer and authority is in the Dubai renovation permits and NOC guide.
Renovating an occupied apartment
Most Dubai apartment renovations happen in towers where neighbours live on every side of the work. The logistics matter as much as the price, and a contractor who has worked under similar building rules will plan for them without being asked.
- Working hours and noisy-work windows. Buildings restrict drilling and demolition to set hours — confirm them before the programme is priced.
- Lift booking and protection. Service-lift slots, corridor and lobby protection and gate passes are usually conditions of the NOC; ask who arranges and pays for each.
- Neighbour notice and leak liability. Wet-area work carries risk to the unit below, which is why buildings insist on waterproofing tests and why the quote should include them in writing.
- Dust control if you stay in. Living through a renovation is realistic for cosmetic scopes; for full renovations with demolition and MEP work, most owners plan to move out for the core weeks.
- Debris route and disposal. Waste removal timing and route are set by the building, and cleared debris is typically a condition of the deposit refund.
Estimate your budget before you request quotes
Run your apartment size, rooms and finish level through the free calculator to get a working budget range, then use it to sense-check quotes.
Prefer a full page? Open the renovation cost calculator.
How to compare apartment renovation quotes
Quotes are only comparable when every contractor prices the same brief. Send each one identical details — size, rooms, photos, finish level and any MEP changes — then check the quotes against this list.
Confirm the scope covers
- Site visit, measurements and scope review
- Demolition, protection and waste removal
- Flooring, painting, joinery, bathroom and kitchen works as listed
- Electrical, plumbing and AC coordination where quoted
- Waterproofing product, coverage and test method for wet areas
Price can change by
- Studio, 1-bed, 2-bed or larger apartment size
- Cosmetic refresh vs full renovation
- Kitchen, bathroom, flooring, ceiling and MEP changes
- Material level and brand choices
- Building rules, access hours and approval scope
Insist on in writing
- A room-by-room BOQ, not only a lump sum
- Fixed items separated from provisional allowances
- Who arranges NOC, deposits, lift protection and permits
- Materials specified by brand, size, model or allowance
- Variation approval process and a retention until snagging closes
Keep a 10-20% contingency: apartments can still reveal hidden plumbing, AC, electrical, slab, waterproofing or access issues after demolition starts. The cheapest headline number with the vaguest scope is usually the most expensive quote by handover.
Find apartment renovation contractors on Bestimate
Bestimate is a quote-comparison marketplace, not a contractor — the pricing above has no sales agenda behind it. Browse renovation companies in Dubai to see verification status, portfolios and service coverage, or explore all providers on the Pros directory. When you are ready, describe your apartment once and compare the itemised quotes that come back on scope, price, timeline and terms.
Related services and guides
Frequently asked questions
How much does it cost to renovate an apartment in Dubai?
As of June 2026, a light studio or 1-bedroom refresh commonly starts around AED 25,000-60,000, targeted 1-2 bedroom upgrades around AED 60,000-180,000, and full mid-range 2-3 bedroom renovations around AED 120,000-320,000. Premium and penthouse-style scopes range higher.
Do I need an NOC to renovate my apartment in Dubai?
Almost always at building level: the owners association, developer or facility management typically requires an NOC covering contractor documents, insurance, work hours, lift protection and a deposit before work starts. An authority permit from Dubai Municipality, Trakhees or the DDA is additionally needed when the scope removes walls, relocates plumbing or electrical points, or remodels wet areas.
How long does an apartment renovation take in Dubai?
A cosmetic refresh typically takes 1-3 weeks after access approval, a kitchen or bathroom 3-8 weeks, and a full 1-2 bedroom renovation 6-12 weeks. Premium 3-bedroom or penthouse-style projects can run 12-24+ weeks. Add roughly 3-5 weeks up front for NOC, drawings and permit on layout-change scopes.
Can I live in my apartment during the renovation?
For cosmetic scopes it is usually workable with dust containment and room-by-room sequencing. For full renovations involving demolition, waterproofing or MEP work, most owners move out for the core weeks — building noise-hour limits also make occupied full renovations slower to programme.
How should I pay an apartment renovation contractor?
Pay in milestones tied to completed work rather than a large upfront deposit, agree in writing how variations are approved before extra work starts, and hold a sensible retention amount until snagging, cleaning and defect items are closed.
How do I choose between apartment renovation quotes?
Compare scope before price. Ask each contractor for a room-by-room BOQ, check that waterproofing, MEP, approvals, protection and waste removal are itemised rather than assumed, and confirm which materials are fixed by brand and model versus priced as allowances. On Bestimate you can also check each company's verification status and portfolio before shortlisting.
Related Dubai services
Compare related service quote guides
Wardrobes in Dubai
Compare Dubai Wardrobes quotes with the same written scope.
Shower Glass Installation in Dubai
Compare Dubai Shower Glass quotes with the same written scope.
Custom Carpentry in Dubai
Compare Dubai Custom Carpentry quotes with the same written scope.
Wallpaper Installation in Dubai
Compare Dubai Wallpaper quotes with the same written scope.
Wall Paneling in Dubai
Compare Dubai Wall Paneling quotes with the same written scope.
Partition Wall Installation in Dubai
Compare Dubai Partition Wall quotes with the same written scope.
