Compare your two written quotes
Enter actual AED prices. No suggested market rate or automatic complexity multiplier.
1–100 whole items; the same quantity applies to both quotes.
Prefer one whole-job quotation for the agreed measured repair and paint areas. If quoted per sqm, ask the provider for the extended total before entering it here. This tool counts whole repair sections, not decimal square metres; use a per-item rate only for genuinely identical priced sections.
Amounts: AED 0–1,000,000 without commas, up to two decimals. Blank remains unknown. These input limits catch mistakes; they are not market ranges.
Quote A
Incomplete — known provider amounts only
Not calculated
9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.
Cost breakdown and unresolved terms
- Labour / package
- Unknown
- Provider-supplied parts
- Unknown
- Visit / diagnosis
- Unknown
- Protection, preparation and assessed drying charges
- Unknown
- Joint finishing, stain treatment and agreed repaint area
- Unknown
- Safe access and ceiling-service coordination
- Unknown
- Removal, waste, return visits and other charges
- Unknown
- Visit credit against approved work
- Unknown
- Provider total with confirmed VAT treatment
- Incomplete
- Separate customer parts, final retail total
- Unknown
A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.
- Confirm: Valid labour / package amount and pricing unit
- Confirm: Parts supply terms and amount
- Confirm: Visit / diagnosis charge
- Confirm: Protection, preparation and assessed drying charges
- Confirm: Joint finishing, stain treatment and agreed repaint area
- Confirm: Safe access and ceiling-service coordination
- Confirm: Removal, waste, return visits and other charges
- Confirm: Visit credit: confirm none or an amount no higher than the visit fee and eligible provider work
- Confirm: VAT treatment of provider amounts
Quote B
Incomplete — known provider amounts only
Not calculated
9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.
Cost breakdown and unresolved terms
- Labour / package
- Unknown
- Provider-supplied parts
- Unknown
- Visit / diagnosis
- Unknown
- Protection, preparation and assessed drying charges
- Unknown
- Joint finishing, stain treatment and agreed repaint area
- Unknown
- Safe access and ceiling-service coordination
- Unknown
- Removal, waste, return visits and other charges
- Unknown
- Visit credit against approved work
- Unknown
- Provider total with confirmed VAT treatment
- Incomplete
- Separate customer parts, final retail total
- Unknown
A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.
- Confirm: Valid labour / package amount and pricing unit
- Confirm: Parts supply terms and amount
- Confirm: Visit / diagnosis charge
- Confirm: Protection, preparation and assessed drying charges
- Confirm: Joint finishing, stain treatment and agreed repaint area
- Confirm: Safe access and ceiling-service coordination
- Confirm: Removal, waste, return visits and other charges
- Confirm: Visit credit: confirm none or an amount no higher than the visit fee and eligible provider work
- Confirm: VAT treatment of provider amounts
Comparison pending. Complete both totals and all scope confirmations. An unconfirmed part, compatibility check or extra is not zero.
Keep clear of sagging, wet or unstable ceilings and water near electrical fittings. Do not open a ceiling, puncture a bulge or paint over an active leak. Structural, electrical or contamination concerns need appropriate specialists.
Request ceiling repair assessment quotes