Interlock paving budget guide
Estimated paving allowance
AED 4,000–5,600
40 m² of new interlock paving, with sub-base and compaction named in the published tier.
VAT status to confirm — not added to this allowance
VAT, minimum charges, demolition and extra drainage must be confirmed separately.
Confirm kerbs, utility moves, major ground correction and access charges. This is not a lift-and-relay repair estimate.
Planning reference only, not a quote. Confirm site conditions, minimum charges and exclusions before booking.
How this estimate is built
Prices checked: 23 October 2026. Based on published local references, not a market average or a guaranteed quote.
40 m² × AED 100–140 per m². The tier does not specify a block product, thickness or vehicle-load suitability. No site uplift, repair rate or minimum charge is invented.
- Price source 1
Revive Hub publishes interlock tiers of AED 75–100, AED 100–140 and AED 140–180 per m², with sub-base and compaction named. Exact product and detailed preparation are not defined. VAT, minimum charges, removal, kerbs, utility moves and drainage alterations require confirmation. No published percentage uplift is applied.