Compare your two written quotes
Enter actual AED prices. No suggested market rate or automatic complexity multiplier.
1–100 whole items; the same quantity applies to both quotes.
A new socket point is not a faceplate replacement. Mixed routes or circuit changes should use an assessed whole-job amount. No circuit capacity is inferred from this tool.
Amounts: AED 0–1,000,000 without commas, up to two decimals. Blank remains unknown. These input limits catch mistakes; they are not market ranges.
Quote A
Incomplete — known provider amounts only
Not calculated
9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.
Cost breakdown and unresolved terms
- Labour / package
- Unknown
- Provider-supplied parts
- Unknown
- Visit / diagnosis
- Unknown
- Circuit work and cable-route changes
- Unknown
- Chasing, plaster and paint reinstatement
- Unknown
- Safe access, permits and parking
- Unknown
- Electrical testing and documentation
- Unknown
- Visit credit against approved work
- Unknown
- Provider total with confirmed VAT treatment
- Incomplete
- Separate customer parts, final retail total
- Unknown
A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.
- Confirm: Valid labour / package amount and pricing unit
- Confirm: Parts supply terms and amount
- Confirm: Visit / diagnosis charge
- Confirm: Circuit work and cable-route changes
- Confirm: Chasing, plaster and paint reinstatement
- Confirm: Safe access, permits and parking
- Confirm: Electrical testing and documentation
- Confirm: Visit credit: confirm none or an amount no higher than the visit fee and eligible provider work
- Confirm: VAT treatment of provider amounts
Quote B
Incomplete — known provider amounts only
Not calculated
9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.
Cost breakdown and unresolved terms
- Labour / package
- Unknown
- Provider-supplied parts
- Unknown
- Visit / diagnosis
- Unknown
- Circuit work and cable-route changes
- Unknown
- Chasing, plaster and paint reinstatement
- Unknown
- Safe access, permits and parking
- Unknown
- Electrical testing and documentation
- Unknown
- Visit credit against approved work
- Unknown
- Provider total with confirmed VAT treatment
- Incomplete
- Separate customer parts, final retail total
- Unknown
A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.
- Confirm: Valid labour / package amount and pricing unit
- Confirm: Parts supply terms and amount
- Confirm: Visit / diagnosis charge
- Confirm: Circuit work and cable-route changes
- Confirm: Chasing, plaster and paint reinstatement
- Confirm: Safe access, permits and parking
- Confirm: Electrical testing and documentation
- Confirm: Visit credit: confirm none or an amount no higher than the visit fee and eligible provider work
- Confirm: VAT treatment of provider amounts
Comparison pending. Complete both totals and all scope confirmations. An unconfirmed part, compatibility check or extra is not zero.
Professional electrical work only. Do not open sockets, chase walls or test live conductors to complete this comparison.
Request new socket installation quotes