Compare Quotes
  • All Services
  • Find Pros
  • QuoteCheck
  • Get Free Quotes
Cost Guides
  • All Cost Guides
  • Home Maintenance
  • Cleaning & Pest
  • AC, Pool & Water
  • Renovation & Interiors
  • Moving & Packing
  • Lessons & Tutoring
  • More Home Services
Free Calculators
  • All Calculators
  • Moving Cost
  • Renovation Cost
  • AC Service Cost
Neighbors
  • Home Ideas & Stories
  • Join Your Community

© 2026 Bestimate Solutions L.L.C-FZ · Dubai, UAE

TermsPrivacyEditorial Standards

Home/Cost Calculators/Motorised Curtain Quote Comparison

Free comparison tool · reviewed 2026-10-14

Motorised Curtain Quote Comparison

Compare the same measured openings, retained or replaced fabric, motor and track system. A motor-only price is not a complete installed curtain quotation.

Compare your two written quotes

Enter actual AED prices. No suggested market rate or automatic complexity multiplier.

One complete agreed project per quote. Quantities and unit rates must already be extended in the written amount.

Keep the number of tracks, their measured lengths and motor models in the agreed specification. A double-track opening may need a different supplied scope from one track; no automatic motor count or fabric weight rating is calculated. Ongoing subscriptions are separate. Use whole-project amounts, never per-metre, per-panel or per-square-metre rates. Ask providers to extend measured quantities, minimum charges and scope allowances into written totals first. Keep quantity 1. All provider amounts must share one confirmed VAT basis; normalize mixed tax bases before entry. Customer purchases use final receipt amounts. Deposits are not discounts or visit credits; refundable deposits and direct authority fees remain outside this result.

Amounts: AED 0–1,000,000 without commas, up to two decimals. Blank remains unknown. These input limits catch mistakes; they are not market ranges.

Quote A

Whole-project pricing only. Enter the provider’s complete amount for the agreed scope, not a unit or hourly rate.

Enter the written price. Any included parts or extras must be marked included below, not added again.

Visit, credits and job extras

Confirm every line. Unknown is not included or free. All amounts here are once per job, not per item.

Your separate parts purchases use their final retail total. For mixed VAT terms within a provider quote, ask for amounts on one consistent basis first.

Quote B

Whole-project pricing only. Enter the provider’s complete amount for the agreed scope, not a unit or hourly rate.

Enter the written price. Any included parts or extras must be marked included below, not added again.

Visit, credits and job extras

Confirm every line. Unknown is not included or free. All amounts here are once per job, not per item.

Your separate parts purchases use their final retail total. For mixed VAT terms within a provider quote, ask for amounts on one consistent basis first.

Quote A

Incomplete — known provider amounts only

Not calculated

9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.

Cost breakdown and unresolved terms
Labour / package
Unknown
Provider-supplied parts
Unknown
Visit / diagnosis
Unknown
Assessed power supply, wiring and reinstatement
Unknown
Remote, wall controls, hub and one-time integration
Unknown
Curtain alterations or replacement outside the package
Unknown
Safe access, removal, programming and handover extras
Unknown
Visit credit against approved work
Unknown
Provider total with confirmed VAT treatment
Incomplete
Separate customer parts, final retail total
Unknown

A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.

  • Confirm: Valid labour / package amount and pricing unit
  • Confirm: Parts supply terms and amount
  • Confirm: Visit / diagnosis charge
  • Confirm: Assessed power supply, wiring and reinstatement
  • Confirm: Remote, wall controls, hub and one-time integration
  • Confirm: Curtain alterations or replacement outside the package
  • Confirm: Safe access, removal, programming and handover extras
  • Confirm: Visit credit: confirm none or an amount no higher than the visit fee and eligible provider work
  • Confirm: VAT treatment of provider amounts

Quote B

Incomplete — known provider amounts only

Not calculated

9 unresolved terms. Missing amounts and any extra VAT are not included in this subtotal; customer-bought parts are separate below.

Cost breakdown and unresolved terms
Labour / package
Unknown
Provider-supplied parts
Unknown
Visit / diagnosis
Unknown
Assessed power supply, wiring and reinstatement
Unknown
Remote, wall controls, hub and one-time integration
Unknown
Curtain alterations or replacement outside the package
Unknown
Safe access, removal, programming and handover extras
Unknown
Visit credit against approved work
Unknown
Provider total with confirmed VAT treatment
Incomplete
Separate customer parts, final retail total
Unknown

A zero contribution means explicitly included, not needed or entered as zero; it does not mean the work or parts are free. No deposit is subtracted.

  • Confirm: Valid labour / package amount and pricing unit
  • Confirm: Parts supply terms and amount
  • Confirm: Visit / diagnosis charge
  • Confirm: Assessed power supply, wiring and reinstatement
  • Confirm: Remote, wall controls, hub and one-time integration
  • Confirm: Curtain alterations or replacement outside the package
  • Confirm: Safe access, removal, programming and handover extras
  • Confirm: Visit credit: confirm none or an amount no higher than the visit fee and eligible provider work
  • Confirm: VAT treatment of provider amounts
Confirm comparable scope

Check only what both providers have confirmed. These are quote checks, not a technical approval by this calculator.

Comparison pending. Complete both totals and all scope confirmations. An unconfirmed part, compatibility check or extra is not zero.

Do not open mains wiring, climb furniture or force a motorised curtain. The installer must check support and motor limits; electrical changes need a qualified electrician. A listed provider is not assumed to support every motor or platform.

Request curtain installation quotesRequest integration only quotes

Curtain installation · Integration only

What this calculator compares

Keep the number of tracks, their measured lengths and motor models in the agreed specification. A double-track opening may need a different supplied scope from one track; no automatic motor count or fabric weight rating is calculated. Ongoing subscriptions are separate. Use whole-project amounts, never per-metre, per-panel or per-square-metre rates. Ask providers to extend measured quantities, minimum charges and scope allowances into written totals first. Keep quantity 1. All provider amounts must share one confirmed VAT basis; normalize mixed tax bases before entry. Customer purchases use final receipt amounts. Deposits are not discounts or visit credits; refundable deposits and direct authority fees remain outside this result.

This tool calculates from your entered quotations; it does not estimate a market tariff or verify a provider. Blank prices, unknown tax terms and unresolved extras keep the result incomplete. You must confirm the topic-specific scope checks before a cost difference appears.

How the arithmetic works

Every amount is a complete agreed project total, entered once. Unit counts are fixed at one; per-item and hourly rates are not available in this context. Ask each provider to extend its measured quantities, team-hours and minimum charges before entering labour, materials or extras. Keep unmatched scope unresolved.

Provider amount = labour/package + separately charged provider parts + visit + extras − eligible visit credit. A credit cannot exceed either the charged visit fee or the entered provider work excluding that visit. It cannot offset customer-bought parts. An included or no-charge visit is not deducted again. This model does not handle a separate cash refund arrangement.

The standard UAE VAT rate is 5%. VAT is added once to VAT-exclusive provider amounts, and not added to amounts already including VAT or confirmed not charged. Enter all of one provider’s amounts on the same VAT basis.

Project cost = provider total after its VAT treatment + your separately purchased parts at their final retail total, including any retail VAT and delivery. This keeps customer-supplied parts visible without taxing them twice. Already-owned parts count at the value you explicitly enter; entering zero deliberately excludes their historic purchase cost. No deposit or prior payment is deducted, so the result is not a remaining balance.

A worked example

Illustrative arithmetic only: AED 2,000 agreed supply-and-fit package plus AED 500 separate electrical work equals AED 2,500 before VAT, or AED 2,625 when both exclude 5%. Package materials and fitting are not added again.

Assumptions and limits

Money is entered in AED with up to two decimal places. Each monetary field is limited to AED 1,000,000, and the project count is fixed at one. Enter extended whole-project amounts only. These are input-error safeguards, not market, capacity or safety limits. Invalid values are not silently rounded into valid inputs. Calculated monetary lines, VAT and totals are rounded to two decimal places.

Unentered damage, scope changes and future work are excluded. The known-provider subtotal uses the amounts as entered, without adding unconfirmed VAT or customer purchases; it is not an all-in quote. Even a complete cost comparison does not certify suitability, workmanship, insurance or approval.

Do not open mains wiring, climb furniture or force a motorised curtain. The installer must check support and motor limits; electrical changes need a qualified electrician. A listed provider is not assumed to support every motor or platform.

Read the related Dubai cost and scope guide·Curtain installation·Integration only